Title:
Shaker Boulevard Bridge Replacement
Poster
Preview Converted Images may contain errors
Abstract
The Shaker Boulevard Bridge Replacement Project designed a replacement bridge to go over the Knox River in Enfield, NH. The current temporary bridge has been in place for over a decade and a permanent solution is required. After conducting a site visit, an engineering study was performed. This study showed a 52 foot span was required, made from rolled steel beams and a cast in place concrete deck. There is a clay layer underground that meant a deep foundation solution was required. A row of piles at each integral abutment were chosen for a foundation to support the structure. The new design includes a two-lane road to replace the existing one-lane bridge, and traffic will be managed with a 6-mile detour during construction and a dredge and fill wetlands permit will be required. The total project is estimated to cost around $2.17 million, balancing functionality, budget, and environmental considerations.
Authors
First Name |
Last Name |
Stephen
|
Nolin
|
Jacob
|
Siegel
|
Parker
|
Swanson
|
Luke
|
Safford
|
Daniel
|
Bartus
|
Leave a comment
Submission Details
Conference URC
Event Interdisciplinary Science and Engineering (ISE)
Department Civil and Environmental Engineering (ISE)
Group CEE Group C
Added April 20, 2025, 5:03 p.m.
Updated April 20, 2025, 5:03 p.m.
See More Department Presentations Here